Some units aren't able to meet integration and system-testing deadlines in the stringent project schedule.
某些单位无法在严格的项目时间表中按期完成集成和系统测试。
The concept is to define a very conservative stance in the early inception of the project schedule.
这就是说,要在项目的最初阶段以一个非常保守的姿态出来。
Set up and maintain up to date of project schedule with right tool (Microsoft Project).
建立和保持合适的工具(微软项目),项目进度的日期。
Your boss wants your reorganization plan by Friday, and you promised to present a project schedule at the next team meeting.
因为老板希望您在星期五之前提交改组计划,而且您答应在下次团队会议时提交项目日程。
Depending on the thoroughness of the simulation effort, it may require a significant percentage of the overall project schedule.
随仿真工作的全面性而定,仿真可能会占用全部项目日程中很大的一部份。
The project schedule does not retroactively update to reflect changes in the system time.
项目日程不会以追溯方式更新以反映系统时间的更改。
These measurements of actual progress should be stored in a central database and then processed for updating the project schedule.
项目的实际进度会被存储到中心数据库中,经由处置后用以更新项目打算。
Your project schedule or work breakdown structure should include rework as a discrete task after every quality control activity.
每一个行为跟踪表,都应该包括这个比较大的任务中需要的每个小的步骤。
You must take time out of your project schedule to invest in process improvement activities.
您需要从项目进度中拿出时间来投入到过程改进活动中。
Meeting project schedule objectives by rushing planned quality inspections may produce negative consequences when errors go undetected.
通过使用计划的突击质量检查方式来达到项目进度目标可能在错误没有被发现的情况下产生消极后果。
Although commissioning and qualification are typically separated within a project schedule, they are in essence, one continuous process.
虽然在一个项目进步表中可以将调试和确认分离开,但本质上它们是一个连续过程。
Take charge of project schedule, quality, progress and accomplishment, lay down, adjust and control the operation of the project.
负责项目的工作计划进度、质量、进度和目标完成情况,具体制定、调整和控制项目运行;
At the very least, most change management products can save the project schedule or requirements in HTML form for easy periodic publication.
毫不夸张地说,大多数更改管理产品都可以采用HTML格式保存项目日程或需求,以便于定期发布。
Choose custom display fields that integrate with your project schedule.
可以选择与您的项目日程集成的自定义显示字段。
A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.
我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。
Prepare, engineering, construction scheme, the project schedule, construction plan.
编制说明、工程概况、施工方案、工程进度、施工平面图。
Follow up and coordinate Logistics, Production, Quality etc. To ensure the achievement of project schedule.
跟踪,协调物流,生产,质量等相关部门,确保项目进度正常。
Are development & design projects adequately tracked utilizing project schedule timeline?
是否设计开发项目使用项目计划时间表得以充分的追踪?
Able to take pressure and work under tight project schedule.
能承受工作压力,能在项目完成时间要求非常紧凑下工作。
But you might not identify all of your project risks if you analyze only the project schedule.
但如果只分析项目日程,就可能无法识别所有项目风险。
Work together with project manager to follow vendor's project, make sure vendor can fulfill the project schedule make delivery on time.
协同项目经理跟踪供应商项目进展,确保供应商满足项目时间表要求,并及时交付。
Prepare the master project schedule and setup WBS and sub-error area identification of project during engineering and construction phase.
在项目详细设计和施工阶段,编制项目总进度计划和项目工作分解结构及各区域划分。
Set up the project schedule and implement plan, take charge of the impellent daily work.
制定新车项目进度计划及实施方案,组织、主持项目进度推进的日常工作;
These calendars are distinct from the Calendar view, which shows the project schedule in a calendar format.
这些日历与“日历”视图不同,后者以日历格式显示项目日程。
Based the authentication test require to debug audio parameter improve audio performance insure project schedule.
根据各种认证测试的要求,调试音频参数,改善音频性能,保证项目进度;
Involve in the project meeting, construction control (civil work, facility or equipment, etc), follow up project schedule.
参与项目会议、施工管理(土建、设备、设施等),追踪项目进度。
The reuse of assets within the project can have a significant bearing on the project schedule, cost, and quality of the delivered system.
工程中资产的重新利用对于工程的时间进度表,成本,以及可交付系统的质量有十分重要的意义。
Furthermore, the project schedule, drawing construction layout.
再者,编制施工进度计划,绘制施工平面布置图。
Products don't always integrate well with others, impacting developer productivity and project schedule.
各个产品通常与其他产品的集成性能并不好,而这会对开发人员的效率和项目进度造成影响。
Manage project team, complete budget and project schedule, be responsible to the gains and losses of managed project.
管理项目团队,完成项目时间进度及预算,对所管理的项目的损益负责;
A point on the project schedule at which the project team assesses progress and quality, and reviews deviations in scope and specifications.
项目时间表中的一个点,在该点上,项目团队评估进度和质量,并评审范围内的偏差以及规范。
Plan and execute statistical analyses on research dataset and studies to deliver quality output as per the project schedule.
在项目规定时间内安排和执行统计分析,并且提供优质的分析结果以供使用。
Approved change requests can cause a change to project scope, project quality, estimated costs, or project schedule.
批准的变更请求可能会改变项目范围、项目质量、费用估算或项目进度。
Verify and manage changes to the project scope, project schedule and project costs as defined in the change management plan.
核实和管理对在变更管理计划中定义的项目范围、进度和成本的变更。
Responsible in aligning team members from engineering, purchasing and production to work according to planned project schedule.
负责协调和监督各部门(技术部,采购部和生产部)达到生产计划。
Work with design team for implementing engineering functions and project schedule control.
和设计团队一起工作,执行工程职能并进行项目进度控制。
If the team is stuck in a holding pattern until a decision is made, this can add days, weeks, or months to the project schedule.
如果团队在作出决策前出于停滞状态,这就可能将项目计划延长数天、数周甚至数月。
Please provide your quote with project budget, project schedule and prior experience in developing games for the iPad or the i Phone.
请提供您的项目预算,项目进度和发展为iPad或iPhone游戏,以前的经验报价。
A project schedule is created by assigning resources and determining the calendar time required for each task.
分配资源,确定每项任务所需的时间,制定项目进度计划。
What should the project manager do to integrate this information into the project schedule?
要把这个信息集成进项目进度计划,项目经理应该做什么?